Bitte verwenden Sie diesen Link, um diese Publikation zu zitieren, oder auf sie als Internetquelle zu verweisen: https://hdl.handle.net/10419/24489 
Kompletter Metadatensatz
DublinCore-FeldWertSprache
dc.contributor.authorBöhringer, Christophen
dc.contributor.authorWickart, Marcelen
dc.contributor.authorMüller, Andreen
dc.date.accessioned2009-02-16T14:56:42Z-
dc.date.available2009-02-16T14:56:42Z-
dc.date.issued2001-
dc.identifier.urihttp://hdl.handle.net/10419/24489-
dc.description.abstractThis paper investigates the economic impacts of two policy proposals: "Strom ohne Atom" (SOA) and "Moratorium Plus" (MOP), both of which contain a premature phase-out of nuclear power in Switzerland. While MOP restricts business-as-usual operation time of existing nuclear power plants to 40 years, which results in a cutback of 10-20 years, SOA foresees a reduction in operation time of 20-30 years and administers combined heat and power to substitute for nuclear energy. Based on simulations with an intertemporal multi-sector general equilibrium model of the Swiss economy, we quantify the price tags for risk reduction from nuclear power operation given additional constraints on back-up technologies. Costs of accelerating the phase-out of nuclear power for an average household amount to 200 CHF/a over the next 45 years under SOA and drop to 60 CHF/a in the case of MOP. If Switzerland were to assure carbon neutrality of a premature phase-out by the use of carbon taxes, adjustment costs would increase to 230 CHF under SOA and 110 CHF under MOP.en
dc.language.isoengen
dc.publisher|aZentrum für Europäische Wirtschaftsforschung (ZEW) |cMannheimen
dc.relation.ispartofseries|aZEW Discussion Papers |x01-68en
dc.subject.jelQ48en
dc.subject.jelC68en
dc.subject.ddc330en
dc.subject.keywordnuclear phase-outen
dc.subject.keywordcomputable general equilibriumen
dc.subject.stwKernenergiepolitiken
dc.subject.stwWirtschaftspolitische Wirkungsanalyseen
dc.subject.stwMakroökonomischer Einflussen
dc.subject.stwAllgemeines Gleichgewichten
dc.subject.stwSchweizen
dc.titleEconomic impacts of a premature nuclear phase-out in Switzerland-
dc.typeWorking Paperen
dc.identifier.ppn856300128en
dc.rightshttp://www.econstor.eu/dspace/Nutzungsbedingungenen
dc.identifier.repecRePEc:zbw:zewdip:5424en

Datei(en):
Datei
Größe
165.13 kB





Publikationen in EconStor sind urheberrechtlich geschützt.