Bitte verwenden Sie diesen Link, um diese Publikation zu zitieren, oder auf sie als Internetquelle zu verweisen: https://hdl.handle.net/10419/243852 
Erscheinungsjahr: 
2020
Quellenangabe: 
[Journal:] Energy Reports [ISSN:] 2352-4847 [Volume:] 6 [Issue:] 2 [Publisher:] Elsevier [Place:] Amsterdam [Year:] 2020 [Pages:] 19-24
Verlag: 
Elsevier, Amsterdam
Zusammenfassung: 
The paper guides three scenarios of power planning for Vietnam for the 2018-2030 period under CO2 emission targets. The analysis employs a model of energy expansion in the form of an optimization problem with the objective of the discounted entire system cost minimization. With each CO2 emission allowance, a scenario of the newly installed capacity structure will be carried out. The results indicate that instead of 42.6% coal-fired installed capacity as indicated in the National Power Development Master Plan for the 2011-2020 period with the Vision to 2030 (known as PDP VII), by 2030 the share of this power source will be around 29% (8% CO2 reduction scenario) and 19% (25% CO2 reduction scenario). Also, the lower emission sources such as hydro, wind, and solar power will be a priority for investment in the next decade. There is an existence of coal-fired power plants replacement by natural gas stations.
Schlagwörter: 
CO2 reduction target
Optimization problem
Power planning
Persistent Identifier der Erstveröffentlichung: 
Creative-Commons-Lizenz: 
cc-by-nc-nd Logo
Dokumentart: 
Article
Erscheint in der Sammlung:

Datei(en):
Datei
Größe
380.68 kB





Publikationen in EconStor sind urheberrechtlich geschützt.