Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/147662 
Year of Publication: 
2006
Series/Report no.: 
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel No. 605
Publisher: 
Universität Kiel, Institut für Betriebswirtschaftslehre, Kiel
Abstract: 
This paper addresses the multiple criteria flight gate assignment problem under uncertainty, which is naturally modeled by fuzzy numbers. The problem examined is a special kind of multicriteria multi-mode resource-constrained project scheduling problem with generalized precedence constraints or time windows. Fuzziness is introduced for basic problem parameters, that is, arrival and departure times, in order to cover possible earliness and tardiness of flights. We solve the problem directly by a special multicriteria metaheuristic, known as fuzzy Pareto simulated annealing, in order to get a representative approximation of the Pareto front.
Subjects: 
flight gate assignment
multicriteria optimization
project scheduling
Pareto simulated annealing
fuzziness
Document Type: 
Working Paper
Document Version: 
Digitized Version

Files in This Item:
File
Size





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.