Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/22665 
Year of Publication: 
2006
Series/Report no.: 
Technical Report No. 2006,22
Publisher: 
Universität Dortmund, Sonderforschungsbereich 475 - Komplexitätsreduktion in Multivariaten Datenstrukturen, Dortmund
Abstract: 
Recent analysis in chatter modelling of BTA deep-hole drilling consisted in phenomenological modelisation of relationships between the observed time series and appearance of chatter during the process. Using the newly developed MEWMA control chart [4, 5], it has even been possible to predict the occurence of chatter about 30 to 50 mm in advance (i.e. up to one minute before the chatter starts). Unfortunately, no relationships between the machine and model parameters have been detected. Therefore, in this paper a physical model of the boring bar is taken into account. Simulation studies of the regenerative process are performed. These simulated time series show the same characteristics as the data recorded during the drilling process and thus support the validity of our model. By running such simulations, we intend to find strategies for chatter prevention in future work.
Document Type: 
Working Paper

Files in This Item:
File
Size
153.08 kB
1.57 MB





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.