Abstract: 
Coordinating the timing and location of new production facilities is one of the challenges of liberalized power sectors. It is complicated by the presence of transmission bottlenecks, oligopolistic competition, and the unknown prospects of low-carbon technologies. The authors build a model encompassing a late and early investment stage, a clean (green) and dirty (brown) technologies, and a single transmission bottleneck and compare dynamic efficiency of several market designs. Allocating network access on a short-term competitive basis distorts investment decisions as brown firms will pre-empt green competitors by investing early. Compensating early investors for future network congestion, as for instance in the E.U., only exacerbates this problem. Dynamic efficiency is restored with long-term transmission rights that can be traded on a secondary market (iusvendendi). As early investment lowers the resale value of the transmission rights, brown firms will invest optimally. The authors show that dynamic efficiency does not require the existence of physical rights for accessing the transmission line (ius utendi), but financial rights on receiving the scarcity revenues generated by the transmission line (ius fructendi) suffice.
Subjects: 
Congestion management
access regulation
real option theory
electricity markets
JEL: 
L94
L13
C72
D43
Document Type: 
Working Paper
Appears in Collections:

Files in This Item:
File
Size
367.35 kB





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.