Search

Add filters:

Use filters to refine the search results.


Results 1-10 of 28.
Year of PublicationTitleAuthor(s)
2012Modeling the operational risk in Iranian commercial banks: Case study of a private bank
In: volume: 8, 2012, p. 1-10
Momen, Omid; Kimiagari, Alimohammad; Noorbakhsh, Eaman
2012An empirical study of innovation-performance linkage in the paper industry
In: volume: 8, 2012, p. 1-6
Farooquie, Parveen; Gani, Abdul; Zuberi, Arsalanullah K.; Hashmi, Imran
2012Building a maintenance policy through a multi-criterion decision-making model
In: volume: 8, 2012, p. 1-7
Faghihinia, Elahe; Mollaverdi, Naser
2012A population-based algorithm for the railroad blocking problem
In: volume: 8, 2012, p. 1-11
Yaghini, Masoud; Seyedabadi, Masoud; Khoshraftar, Mohamad M
2012A hybrid meta-heuristic algorithm for the vehicle routing problem with stochastic travel times considering the driver's satisfaction
In: volume: 8, 2012, p. 1-6
Tavakkoli-Moghaddam, Reza; Alinaghian, Mehdi; Salamat-Bakhsh, Alireza; Norouzi, Narges
2012Resource leveling scheduling by an ant colony-based model
In: volume: 8, 2012, p. 1-9
Garmsiri, Mohsen; Abassi, Mohammad
2012A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
In: volume: 8, 2012, p. 1-7
Maleki-Darounkolaei, Aref; Modiri, Mahmoud; Tavakkoli-Moghaddam, Reza; Seyyedi, Iman
2012An L1-norm method for generating all of efficient solutions of multi-objective integer linear programming problem
In: volume: 8, 2012, p. 1-8
Tohidi, Ghasem; Razavyan, Shabnam
2012Risk determinants of small and medium-sized manufacturing enterprises (SMEs): An exploratory study in New Zealand
In: volume: 8, 2012, p. 1-13
Islam, Ariful; Tedford, Des
2012Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
In: volume: 8, 2012, p. 1-13
Noori-Darvish, Samaneh; Tavakkoli-Moghaddam, Reza