Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/70526 
Year of Publication: 
2009
Series/Report no.: 
Working Paper No. 2009-24
Publisher: 
Federal Reserve Bank of Chicago, Chicago, IL
Abstract: 
We measure industry evolution following permanent changes in the level and location of demand for gasoline in hundreds of counties during the time surrounding the completion of Interstate Highway segments. We find that the timing and margin of adjustment depends on whether the new highway is located close to or far from the old route. When the new highway is close to the old one, there is no evidence that the number of stations changes around the time it opens. However, average station size increases by 6% before the highway is completed. When the new highway is far from the old one (say, 5-10 miles), the number of stations increases by 8% and average station size remains unchanged. Unlike the station size adjustment when the new highway is close, the entire increase takes place after construction. These results provide evidence on how this industry, which is characterized by high location-specific sunk costs, adjusts to demand changes. Our results are consistent with theories in which firms have strategic investment incentives to preempt competitors.
Document Type: 
Working Paper

Files in This Item:
File
Size
794.38 kB





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.