Bitte verwenden Sie diesen Link, um diese Publikation zu zitieren, oder auf sie als Internetquelle zu verweisen: https://hdl.handle.net/10419/258084 
Erscheinungsjahr: 
2020
Quellenangabe: 
[Journal:] Risks [ISSN:] 2227-9091 [Volume:] 8 [Issue:] 4 [Article No.:] 131 [Publisher:] MDPI [Place:] Basel [Year:] 2020 [Pages:] 1-14
Verlag: 
MDPI, Basel
Zusammenfassung: 
Specially in the case of scenarios under uncertainty, the efficient management of risk when matching assets and liabilities is a relevant issue for most insurance companies. This paper considers such a scenario, where different assets can be aggregated to better match a liability (or the other way around), and the goal is to find the asset-liability assignments that maximises the overall benefit over a time horizon. To solve this stochastic optimisation problem, a simulation-optimisation methodology is proposed. We use integer programming to generate efficient asset-to-liability assignments, and Monte-Carlo simulation is employed to estimate the risk of failing to pay due liabilities. The simulation results allow us to set a safety margin parameter for the integer program, which encourage the generation of solutions satisfying a minimum reliability threshold. A series of computational experiments contribute to illustrate the proposed methodology and its utility in practical risk management.
Schlagwörter: 
assets and liabilities management
risk management
uncertainty
matheuristics
simulation
Persistent Identifier der Erstveröffentlichung: 
Creative-Commons-Lizenz: 
cc-by Logo
Dokumentart: 
Article
Erscheint in der Sammlung:

Datei(en):
Datei
Größe
474.13 kB





Publikationen in EconStor sind urheberrechtlich geschützt.