Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/243598 
Year of Publication: 
2019
Citation: 
[Journal:] Energy Reports [ISSN:] 2352-4847 [Volume:] 5 [Publisher:] Elsevier [Place:] Amsterdam [Year:] 2019 [Pages:] 431-435
Publisher: 
Elsevier, Amsterdam
Abstract: 
Underground gas storage (henceforth; UGS) is considered as a common method which resolves the seasonality problem of transportation and distribution of gas phase in the oil and gas industries. The main objective of this study is to simulate one of Iranian's depleted gas condensate reservoir and compare different injectivity scenarios especially nitrogen injection to enhance the gas production. Based on the anticipated target rate performance of UGS with a different scenario that was analyzed the effect of injection gas, finding optimum original reservoir pressure, an optimum number of wells. Moreover, abandonment pressure is one of the main concerns for UGS process in partially depleted reservoirs especially in the depleted reservoir to decrease the ultimate recovery. It contains insufficient base gas reserves, and if it may not meet the target withdrawal rate, the original reservoir pressure has been estimated at 250 bar. Consequently, it found that this problem can be addressed by injecting a higher volume of gas in the first cycle and due to the existence of new wells, the maximum injection rate was obtained about 6.1*1010m3.
Subjects: 
Depleted gas condensate reservoir
Gas production
Gas reserves
Nitrogen injection
Original reservoir pressure
Underground gas storage
Persistent Identifier of the first edition: 
Creative Commons License: 
cc-by Logo
Document Type: 
Article
Appears in Collections:

Files in This Item:
File
Size





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.