Abstract: 
Eine gelingende Energiewende und sichere Stromversorgung erfordern die Verstärkung und den Ausbau der Netzinfrastruktur. Ende 2015 wurde der Vorrang von Erdkabeln vor Freileitungen in siedlungsnahen Bereichen beschlossen, um den Netzausbau schneller zu realisieren und lokale Widerstände zu minimieren. Der Beitrag betrachtet die Wahrnehmung und Akzeptanz eines geplanten Erdkabelprojekts zum Stromnetzausbau im ländlichen Raum (Rheinisches Braunkohlerevier) aus der Sicht lokal betroffener Gruppen. Mittels qualitativer Interviews werden die Perspektiven betroffener Anwohner und Landwirte bezogen auf die Energiewende, den Netzausbau, Akzeptanz und Bewertung von Erdkabeln und Freileitungen im Allgemeinen sowie der geplanten Erdkabeltrasse und zugehöriger Nebenanlagen im Speziellen erhoben und miteinander verglichen. Die Ergebnisse zeigen gruppenbezogene Gemeinsamkeiten und Unterschiede. Generell ist eine positive Einstellung beider Gruppen gegenüber der Energiewende und eine Präferenz für Erdkabel im Vergleich mit Freileitungen zu konstatieren. In Bezug auf beide Themen gibt es aber auch kritische Äußerungen. Trotz der generellen Präferenz für Erdkabel wird die konkrete geplante Erdkabeltrasse in der Untersuchungsregion von den betroffenen Anwohnern eher neutral, teils gleichgültig und in verschiedenen Punkten kritisch bewertet. Die Haltung der Landwirte ist aufgrund der Vielzahl wahrgenommener Nachteile eher ablehnend und führt partiell zu (aktiven) Widerstandshandlungen, die das Vorhaben verzögern könnten. Es wird deutlich, dass regionale Standortmerkmale und raum-zeitliche Prozesse, Gewöhnungseffekte sowie Erfahrungswissen eine wesentliche Rolle bei der Bewertung der geplanten Erdkabeltrasse spielen, die bei der Planung von Netzinfrastrukturprojekten berücksichtigt werden sollten.
Abstract (Translated): 
A successful energy turnaround - the so-called Energiewende - requires the reinforcement and expansion of the electricity grid. In late 2015, the German government approved a law prioritizing the use of underground cables over overhead lines near residential areas in order to speed up the grid expansion and to minimize local resistances. This paper deals with the perception and acceptance of concerned parties regarding an underground cable project planned in a rural area (Rheinisches Braunkohlerevier). By means of qualitative interviews the perspectives of local farmers and residents on the Energiewende, acceptance and evaluation of the grid expansion in general as well as the planned underground cable project and its ancillary facilities which are to be implemented in the living environment of the two affected parties were investigated and compared. The results show group-related similarities and differences. Overall, both groups were found to have a positive attitude towards the Energiewende and a preference for underground cables compared to overhead lines. However, criticism towards both issues was also voiced. Despite the general preference for underground cables, local residents evaluate the particular underground cable project in the investigated region rather neutral, partly indifferent, and in some aspects critical. In contrast, the attitude of local farmers is rather critical due to a multitude of perceived disadvantages, which partially lead to (active) acts of resistance that could slow down the project. It becomes obvious that regional site characteristics, spatio-temporal processes, habit-forming effects as well as experience and knowledge play a substantial role when evaluating the planned underground cables and that these aspects should be considered when planning grid infrastructure projects.
Subjects: 
Akzeptanz
Stromnetzausbau
Erdkabel
Energiewende
Infrastrukturprojekt
Akteure
Acceptance
Grid expansion
Underground cables
Energy turnaround
Infrastructure project
Energy transition
Persistent Identifier of the first edition: 
Creative Commons License: 
cc-by-nc-nd Logo
Document Type: 
Article

Files in This Item:
File
Size





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.