Bitte verwenden Sie diesen Link, um diese Publikation zu zitieren, oder auf sie als Internetquelle zu verweisen: https://hdl.handle.net/10419/192844 
Erscheinungsjahr: 
2017
Schriftenreihe/Nr.: 
Discussion Papers No. 862
Verlag: 
Statistics Norway, Research Department, Oslo
Zusammenfassung: 
A decarbonization of the energy sector calls for large new investments in renewable energy production. When choosing the location for increased production capacity, the producer has typically limited incentives to take fully into account the investments costs of the subsequent need for increased grid capacity. This may lead to inefficient choices of location. We discuss the regulatory background for an integrated EU electricity market, the binding renewable targets, and renewable incentives. We explore analytically the design of feed-in premiums that secure an optimal coordinated development of the entire electricity system. We investigate numerically the potential welfare cost of a non-coordinated development of grids and production capacity in the Norwegian energy system. Our result indicates that grid investment costs can be substantially higher when the location decision is based on private profitability compared with a socially optimal location. However, the difference in the sum of grid investment cost and production cost is much more modest, as location based on private profitability leads to capacity increase in areas with better wind conditions.
Schlagwörter: 
Energy policy
renewable targets
wind power
location of renewable energy production
feed-in premiums
JEL: 
Q42
Q48
Q58
Dokumentart: 
Working Paper

Datei(en):
Datei
Größe
1.06 MB





Publikationen in EconStor sind urheberrechtlich geschützt.