- EconStor
- Universitat Politècnica de Catalunya (UPC), BarcelonaTech
- The School of Industrial, Aerospace and Audiovisual Engineering of Terrassa (ESEIAAT), Universitat Politècnica de Catalunya (UPC)
- Journal of Industrial Engineering and Management (JIEM), Universitat Politècnica de Catalunya (UPC), BarcelonaTech
Bitte verwenden Sie diesen Link, um diese Publikation zu zitieren, oder auf sie als Internetquelle zu verweisen:
https://hdl.handle.net/10419/188664
Autor:innen:
Erscheinungsjahr:
2014
Quellenangabe:
[Journal:] Journal of Industrial Engineering and Management (JIEM) [ISSN:] 2013-0953 [Volume:] 7 [Issue:] 5 [Publisher:] OmniaScience [Place:] Barcelona [Year:] 2014 [Pages:] 1433-1446
Verlag:
OmniaScience, Barcelona
Zusammenfassung:
Purpose: The stable relationship of one-supplier-one-customer is replaced by a dynamic relationship of multi-supplier-multi-customer in current market gradually, and efficient scheduling techniques are important tools of the dynamic supply chain relationship establishing process. This paper studies the optimization of the integrated planning and scheduling problem of a two-stage supply chain with multiple manufacturers and multiple retailers to obtain a minimum supply chain operating cost, whose manufacturers have different production capacities, holding and producing cost rates, transportation costs to retailers. Design/methodology/approach: As a complex task allocation and scheduling problem, this paper sets up an INLP model for it and designs a Unit Cost Adjusting (UCA) heuristic algorithm that adjust the suppliers' supplying quantity according to their unit costs step by step to solve the model. Findings: Relying on the contrasting analysis between the UCA and the Lingo solvers for optimizing many numerical experiments, results show that the INLP model and the UCA algorithm can obtain its near optimal solution of the two-stage supply chain's planning and scheduling problem within very short CPU time. Research limitations/implications: The proposed UCA heuristic can easily help managers to optimizing the two-stage supply chain scheduling problems which doesn't include the delivery time and batch of orders. For two-stage supply chains are the most common form of actual commercial relationships, so to make some modification and study on the UCA heuristic should be able to optimize the integrated planning and scheduling problems of a supply chain with more reality constraints. Originality/value: This research proposes an innovative UCA heuristic for optimizing the integrated planning and scheduling problem of two-stage supply chains with the constraints of suppliers' production capacity and the orders' delivering time, and has a great practical significance to the dynamic relationship establishment of multi-supplier-multi-customer in current market.
Schlagwörter:
supply chain
planning and scheduling
unit cost adjusting
UCA heuristic
dynamic relationship
planning and scheduling
unit cost adjusting
UCA heuristic
dynamic relationship
Persistent Identifier der Erstveröffentlichung:
Dokumentart:
Article
Datei(en):
Datei
Beschreibung
Größe
Format
Publikationen in EconStor sind urheberrechtlich geschützt.