Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/188404 
Year of Publication: 
2009
Citation: 
[Journal:] Journal of Industrial Engineering and Management (JIEM) [ISSN:] 2013-0953 [Volume:] 2 [Issue:] 3 [Publisher:] OmniaScience [Place:] Barcelona [Year:] 2009 [Pages:] 437-463
Publisher: 
OmniaScience, Barcelona
Abstract: 
We built on the Economic Lot Scheduling Problem Scheduling (ELSP) literature by making some modifications in order to introduce new constraints which had not been thoroughly studied with a view to simulating specific real situations. Specifically, our aim is to propose and simulate different scheduling policies for a new ELSP variant: Deliberated Coproduction. This problem comprises a product system in an ELSP environment in which we may choose if more than one product can be produced on the machine at a given time. We expressly consider the option of coproducing two products whose demand is not substitutable. In order to draw conclusions, a simulation model and its results were developed in the article by employing modified Bomberger data which include two items that could be produced simultaneously.
Subjects: 
ELSP
coproduction
simulation
heuristics
Persistent Identifier of the first edition: 
Creative Commons License: 
cc-by-nc Logo
Document Type: 
Article

Files in This Item:
File
Size





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.