Bitte verwenden Sie diesen Link, um diese Publikation zu zitieren, oder auf sie als Internetquelle zu verweisen: https://hdl.handle.net/10419/157493 
Erscheinungsjahr: 
2016
Quellenangabe: 
[Journal:] Journal of Industrial Engineering International [ISSN:] 2251-712X [Volume:] 12 [Publisher:] Springer [Place:] Heidelberg [Year:] 2016 [Pages:] 299-310
Verlag: 
Springer, Heidelberg
Zusammenfassung: 
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, multi-objective particle swarm optimization (MOPSO) algorithm is implemented. Also, as well as MOPSO, two other optimization algorithms are used for comparing the results. Eventually, Taguchi method with metrics analysis is presented to tune the algorithms' parameters and a multiple criterion decision making technique based on the technique for order of preference by similarity to ideal solution is applied to choose the best algorithm. Comparison results confirmed the supremacy of MOPSO to the other algorithms.
Schlagwörter: 
Scheduling
Single machine
Periodic maintenance
Total earliness-tardiness
Multi-objective optimization
MCDM
Persistent Identifier der Erstveröffentlichung: 
Creative-Commons-Lizenz: 
cc-by Logo
Dokumentart: 
Article

Datei(en):
Datei
Größe
1.61 MB





Publikationen in EconStor sind urheberrechtlich geschützt.