Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/148695 
Year of Publication: 
2016
Series/Report no.: 
27th European Regional Conference of the International Telecommunications Society (ITS): "The Evolution of the North-South Telecommunications Divide: The Role for Europe", Cambridge, United Kingdom, 7th-9th September, 2016
Publisher: 
International Telecommunications Society (ITS), Calgary
Abstract: 
There has been a concerted effort in recent years to undertake more strategic, long-term, and cross-sector assessment of national infrastructure. This paper reflects on the assessment of fixed broadband within the recent National Needs Assessment, which aims to identify options for meeting the UK's infrastructure ‘needs' up to 2050. It establishes the future ‘need' for different levels of fixed broadband connectivity and how much investment is required to rollout infrastructure to meet different regional coverage and capacity levels. Two key technologies are initially assessed here using a cost modelling approach, including Fibre-To-The-Premises (FTTP) utilising a Gigabit Passive Optical Network and FTTP utilising a Point-To-Point fibre connection. The results show the aggregate investment required to deliver different levels of fixed broadband access to different proportions of the population. The costs raise linearly for delivery to premises in urban areas, with total urban coverage by FTTP using a Gigabit Passive Optical Network costing £14.1 billion and FTTP using a Point-To-Point network costing £17 billion. The costs for rural and remote areas begin to rise sharply, to the extent that deployment of these technologies to the final third of premises could cost almost the same amount as deployment to the first two thirds of premises in urban areas. Deployment to rural and remote areas was estimated to cost £13.7 billion for FTTP using a Gigabit Passive Optical Network and £15.8 billion for FTTP using a Point-To-Point network. Total FTTP coverage using a Gigabit Passive Optical Network costs £27.7 billion, whereas FTTP coverage using a Point-To-Point network costs £32.8 billion. The largest aggregate investment is required in the South East, North West and East of England, due to their large population sizes. Across these technologies the lowest average marginal cost per premises was in London for urban areas, Scotland for rural areas, and Wales for remote areas.
Document Type: 
Conference Paper

Files in This Item:
File
Size
452.84 kB





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.