Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/147653 
Year of Publication: 
2005
Series/Report no.: 
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel No. 595
Publisher: 
Universität Kiel, Institut für Betriebswirtschaftslehre, Kiel
Abstract: 
This paper addresses the airport flight gate assignment problem with multiple objectives. The objectives are to maximize the total flight gate preferences, to minimize the number of towing activities and to minimize the absolute deviation of the new gate assignment from a so-called reference schedule. The problem examined is a multicriteria multi-mode resource-constrained project scheduling problem with generalized precedence constraints or time windows. While in previous approaches the problem has been simplified to a single objective counterpart, we tackle it directly by a multicriteria metaheuristic, namely Pareto Simulated Annealing, in order to get a representative approximation of the Pareto front.
Subjects: 
airport gate assignment
multiple criteria optimization
project scheduling
time windows
Pareto simulated annealing
Document Type: 
Working Paper
Document Version: 
Digitized Version

Files in This Item:
File
Size





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.