EconStor >
Westfälische Wilhelms-Universität Münster (WWU) >
Centrum für angewandte Wirtschaftsforschung Münster (CAWM), Universität Münster  >
CAWM Discussion Papers, Universität Münster  >

Please use this identifier to cite or link to this item:

Full metadata record

DC FieldValueLanguage
dc.contributor.authorFlinkerbusch, Kaien_US
dc.contributor.authorHeuterkes, Michaelen_US
dc.description.abstractThis article examines potential cost reductions in the market for balancing power by pooling all four German control areas. In a united control area both the procurement and the production of balancing power may be more efficient than in four separated control areas. Our data contain published bids on energy procurement as well as balancing power flows in the period from December 2007 to November 2008. A reference scenario simulates the market results for primary and secondary balancing power, as well as minutes reserve. Subsequently, we simulate a united control area by pooling the historical bids of each control area and by netting the area imbalances. We show that in the period under review the total costs of procured and produced balancing power are reduced by 17 %. The production costs for secondary balancing power are reduced by even 45 %.en_US
dc.publisherCAWM Münsteren_US
dc.relation.ispartofseriesCAWM discussion paper / Centrum für Angewandte Wirtschaftsforschung Münster 25en_US
dc.subject.keywordBalancing Poweren_US
dc.titleCost reduction potentials in the German market for balancing poweren_US
dc.typeWorking Paperen_US
Appears in Collections:CAWM Discussion Papers, Universität Münster

Files in This Item:
File Description SizeFormat
671790811.pdf435.57 kBAdobe PDF
No. of Downloads: Counter Stats
Show simple item record
Download bibliographical data as: BibTeX

Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.